top of page
Search

Commissioning Custom Furniture for Home Renovations

Writer: Richard Gentry
Richard Gentry
Sep 10
9 min read

Table of Contents

  • Step 1: Define Your Project Scope and Functional Design

  • Step 2: Questions to Ask a Furniture Maker Before You Commit

  • Step 3: Design Development, 3D Rendering, and Client Approval

  • Step 4: Material Sourcing, Wood Species, and Finish Selection

  • Step 5: Understanding Custom Furniture Lead Times and Fabrication

  • Step 6: The Cost of Custom Made Furniture and Deposit Structure

  • Step 7: Delivery, Installation, and Renovation Timeline Integration

  • Conclusion

  • Frequently Asked Questions

Last Updated: September 10, 2026

Step 1: Define Your Project Scope and Functional Design

Commissioning custom furniture for home renovations starts with a clear brief, not a browse through a showroom. The piece has to solve a specific problem: an awkward corner, a dining room that needs to seat ten, a desk that fits a wall nobody else could measure correctly.

Begin by writing down three things: the exact dimensions of the space, how the piece will be used daily, and the style you want it to sit within. Functional design comes before aesthetic intent. A table that seats eight but blocks the kitchen walkway fails no matter how beautiful the walnut is.

Pro Tip Measure at the finished floor and finished wall, not the current subfloor. Renovations change room dimensions by an inch or more once flooring and drywall are complete, and that difference decides whether a custom dimensions piece actually fits.

Step 2: Questions to Ask a Furniture Maker Before You Commit

The right questions to ask a furniture maker separate a true bespoke commission from a shop that simply resizes a catalog item. But the questions that actually protect you are contractual, not conversational, and almost no guide covers them. This is the fine print that decides who pays when something goes wrong.

Start with the basics: who actually builds the piece, how long they have worked in the trade, and whether they handle joinery in-house or subcontract it. Then move to the paperwork.

Deposits and payment milestones. A deposit is not a tip, it reserves shop time and buys lumber. Ask what percentage is required up front, what each later payment is tied to (milling complete, assembly complete, finish cured), and whether any portion is refundable. A common pattern is a deposit to reserve the slot, a progress payment at assembly, and a balance due before or at delivery. Get the schedule in writing.

Change orders. After you approve the design, any alteration, a different wood species, a wider top, a moved drawer, is a change order. Ask how changes are priced, whether they reset the lead time, and whether the maker requires written approval before proceeding. Unpriced verbal changes are how budgets slip.

Intellectual property. Ask who owns the design drawings. If you commissioned a one-of-a-kind piece, you may want the right to prevent the maker from reproducing it; if the maker wants to photograph and resell the design, that should be agreed in advance. Most disputes here are about expectations, not law.

Warranty and remedies. Ask what the warranty covers, structural failure, finish failure, seasonal movement, for how long, and what the remedy is (repair, replace, refund). Ask what happens if the finished piece does not match the approved design, and whether the maker will correct it at their cost.

Cancellation and delay. Ask what happens to your deposit if you cancel, and what the maker owes you if they miss the delivery date. A realistic lead-time clause with a defined remedy is worth more than a vague promise.

  • Who builds the piece, and how many years have they worked at it?

  • What is the deposit percentage, and what triggers each later payment?

  • How are change orders priced and approved?

  • Who owns the design drawings?

  • What does the warranty cover, for how long, and what is the remedy?

  • What are the cancellation and delay terms?

A maker who hesitates on any of these is telling you something. A maker who puts them in writing is telling you something better.

Key Takeaway Ask for the contract before you pay the deposit, not after. The deposit schedule, change-order process, IP terms, and warranty are the four clauses that decide whether a commission ends in a finished heirloom or a dispute.

Step 3: Design Development, 3D Rendering, and Client Approval

Design development turns a written brief into something you can actually see. Most established makers produce a design proposal with scaled drawings, and many now include a 3D rendering so you can judge proportions before fabrication begins.

A furniture maker and client reviewing a 3D rendering of a custom walnut dining table on a laptop in a bright woodworking studio, with wood samples and sketches on the table

This stage is where design iteration happens cheaply. Moving a leg in a rendering costs nothing. Moving it after the joinery is cut costs a rebuild.

For unusual spaces, ask whether a prototype or a full-size mock-up of a critical joint is possible. It adds time, but it removes the risk of a piece that looks right on screen and wrong in the room. Client approval at this stage should be in writing, with the exact dimensions, wood species, and finish selection recorded.

Step 4: Material Sourcing, Wood Species, and Finish Selection

Material sourcing decides how the piece ages, not just how it looks on delivery day. Walnut, white oak, cherry, ash, and chestnut each move, darken, and wear differently over decades.

Ask where the lumber comes from and whether it is kiln-dried to a stable moisture content for your climate. Sustainably harvested domestic hardwoods are widely available, and the USDA Forest Service on sustainable forest management explains how responsible sourcing is verified. A maker who cannot tell you the source of their stock is a maker who cannot guarantee how it will behave.

Finish selection matters just as much. Oil finishes feel warmer and can be repaired locally; film finishes resist spills better but are harder to spot-repair. For a family dining table, a hardwax oil is often chosen. For a desk that sees daily coffee, a catalyzed finish is a common choice.

Watch Out Skipping a finish sample is the most common and most expensive mistake in a bespoke commission. A stain that looks rich on a small chip can read completely different across a six-foot tabletop. Always approve a finished sample of the actual wood species before fabrication starts.

Step 5: Understanding Custom Furniture Lead Times and Fabrication

Custom furniture lead times typically run from several weeks for a simple side table to several months for a large dining table or a full set of bespoke cabinetry (sba.gov). The range depends on design complexity, material availability, and how full the maker's schedule already is.

Fabrication itself moves through predictable stages: milling and acclimating the lumber, cutting joinery, dry-fitting, assembly, sanding, finishing, and a cure period before the piece can be moved. The cure period is the stage clients forget, and it is the one that cannot be rushed without risking a finish that fails within a year.

If your renovation has a fixed completion date, tell the maker that date at the first consultation, not the week before delivery. A realistic schedule built backward from your move-in date protects both of you.

Step 6: The Cost of Custom Made Furniture and Deposit Structure

The cost of custom made furniture reflects materials, hours of handwork, and the maker's experience, so it varies widely by piece. A handcrafted dining table in solid walnut will always cost more than a mass-market table in veneered particleboard, because the material and the labor are genuinely different (fs.usda.gov).

Most makers use a deposit structure that spreads payment across milestones: a deposit to reserve shop time and buy lumber, a progress payment at assembly, and a final balance before or at delivery. Ask exactly what each payment covers and what happens to your deposit if you cancel.

At Richard Gentry Designs, published pricing gives you a real reference point rather than a vague range. The Real Walnut Farm Table is listed at $2,850, while a larger Ambrosia Dining Table runs $6,500. Those figures show how wood species, size, and complexity move the number.

Piece

Listed Price

Best For

Real Walnut Farm Table

$2,850

Everyday family dining

Artisan Desk in Flame Walnut

$2,850

Home office, tight footprints

Walnut Dining Table with Ebony Accents

$5,500

Formal dining rooms

Ambrosia Dining Table

$6,500

Statement centerpieces

Key Takeaway Get the deposit schedule and the cancellation terms in writing before you pay anything. A clear contract protects the client and the furniture maker equally, and it is the single best defense against a dispute later.

Step 7: Delivery, Installation, and Renovation Timeline Integration

Delivery and installation are logistics, and logistics fail when they are treated as an afterthought. A large dining table may need a doorway cleared, a stairwell measured, or a window removed to get into the room. Confirm the path before the delivery date, and confirm who is responsible for the piece once it crosses the threshold.

Integration with renovation timelines is where most projects go sideways, and it is the part almost every guide skips. The core problem is that custom furniture and construction run on different clocks. A general contractor schedules trades in sequence; a furniture maker schedules a single piece through milling, joinery, assembly, finishing, and a cure period that cannot be rushed. If you do not reconcile those two clocks, you end up paying for storage, delaying a move-in, or installing a fresh finish into an active dust zone.

Sequence the commission against the construction schedule. Built-ins and cabinetry usually install before final paint, because they are part of the envelope and need to be caulked and painted in place. Freestanding pieces, dining tables, desks, beds, should arrive after flooring, paint, and major construction are finished. Order cabinetry and built-ins early; order freestanding pieces later. This single sequencing decision prevents most storage and damage problems.

Build a buffer, not a date. Aim for at least a week between the contractor's final walkthrough and the furniture delivery. Dust and humidity swings during active work can damage a fresh finish, and a cure period that gets compressed by a rushed schedule is the most common cause of a finish that fails within a year.

Plan for storage if the dates slip. Renovations slip. If your furniture is ready before the room is, ask the maker whether they can hold the piece in a climate-controlled shop, for how long, and at what cost. Storing a solid-wood table in an unconditioned garage through a humid summer is how a flat top becomes a cupped one.

Coordinate access and protection. Confirm the delivery path, the door widths, and whether the floor needs protection before the piece is carried in. If the piece is large, ask whether the maker delivers and installs or ships only, the difference in responsibility and cost is significant.

Watch Out Do not schedule furniture delivery on the same day as a major trade. A plumber, painter, or electrician in the room when a finished piece arrives is how scratches, dents, and finish damage happen, and how responsibility gets disputed.

This is the part most guides skip, and it is the part that keeps a project on budget. Treat the furniture commission as a line item on the construction schedule, not a separate errand, and the two timelines stop fighting each other.

Conclusion

Coordinating a custom furniture commission with an active renovation is genuinely hard, and the details that decide success are contracts, lead times, and sequencing, not inspiration boards. Richard Gentry Designs brings over 25 years of artisan experience to hand-crafted wood furniture tailored to your exact space and design vision. From a Walnut Dining Table to bespoke cabinetry and desks, each piece is built to your specific dimensions and finished to last generations. Get started with Richard Gentry Designs and furnish your renovated home with heirloom-quality pieces made to fit it precisely.

Frequently Asked Questions

How much does it cost to get furniture custom made for a renovation?

The cost of custom made furniture depends on size, wood species, and complexity. At Richard Gentry Designs, pieces range from $1,400 for a pair of English walnut matching oval side tables to $6,500 for an Ambrosia Dining Table. A typical custom dining table falls between $2,850 and $5,900. Expect to pay a deposit upfront, with the balance due before delivery. Custom work costs more than retail because every piece is built to your exact dimensions and design.

How long does it take to commission a custom piece of furniture?

Custom furniture lead times vary by project complexity and the furniture maker's current schedule. A simple side table might take 4 to 6 weeks, while a large dining table or cabinetry set can take 10 to 16 weeks or longer. Always ask for a written timeline before paying a deposit. If your renovation finishes in three months, start the commissioning process at least four months before your target move-in date to allow for design iterations and fabrication.

What should I ask a furniture maker before commissioning a piece?

Ask about their experience with your specific project type, their deposit structure, and what happens if you dislike the finished piece. Request a written contract that covers the design proposal, materials, dimensions, timeline, and payment schedule. Confirm whether they handle delivery and installation or if you need to arrange that separately. A furniture maker should welcome these questions.

Can a custom furniture maker build something to fit an awkward space?

Yes. Custom dimensions are one of the main reasons homeowners commission furniture. A furniture maker takes site measurements and builds to fit your exact space, whether that means a dining table for a narrow room, a desk for an angled corner, or cabinetry for an irregular wall. Bring photos and measurements to your initial consultation. The design proposal will show how the piece fits your layout before fabrication begins.

SHOP

 
 
 

Comments


Contact

rfrgentry@yahoo.com

615-563-2401

Visit

1073 Curlee Creek Rd, Readyville, TN 37149

  • Facebook
  • Instagram
  • Yelp!

Copyright 2026 Richard F. Gentry Designs

bottom of page